Skip to main content
FieldBase

One Cabinet. Power and Connectivity, Ready to Deploy.

Fieldbase Integrated Power & Connectivity Cabinets combine solar power management, battery storage, network equipment, and connectivity hardware in a single ruggedised enclosure—purpose-built for rapid deployment in remote, harsh, and off-grid environments.

Trusted by

Airspan
UBA
Druid
Dangote
Integrated Power & Connectivity Cabinets

Overview

Overview

Fieldbase Integrated Power & Connectivity Cabinets solve this problem by pre-integrating everything into a single, tested, field-ready unit before it leaves our workshop. The cabinet ships to site fully wired and pre-configured—solar charge controller, battery management, inverter, UPS, network switch, router, and connectivity hardware (cellular, Starlink, or licensed radio) all installed, cabled, and tested as a single system.

The result is faster deployment, simpler maintenance, a single warranty and support relationship, and a consistent, repeatable installation standard across multiple sites. Whether you're rolling out a network of rural telecoms towers, deploying community connectivity points, or equipping remote industrial monitoring sites, our integrated cabinets dramatically reduce the time and complexity of each installation.

Cabinet configuration options

Standard Connectivity Cabinet

Pre-integrated enclosure for sites with grid power or an existing power source. Contains network switching, routing, and connectivity hardware (configurable for Starlink, cellular, or licensed radio backhaul).

Best for

    Urban and peri-urban sites with reliable grid power. Schools, health facilities, and small office locations where simplicity and speed of deployment are priorities.

    Solar-Powered Connectivity Cabinet

    Includes solar charge controller, battery bank, and inverter alongside the full connectivity hardware stack. Fully self-contained and off-grid capable. Available in configurations from 200Wh to 10kWh battery storage depending on load requirements and autonomy targets.

    Best for

      Rural telecoms points, community Wi-Fi nodes, remote monitoring sites, and any location without reliable grid power.

      How organizations use it

      Rural Telecoms & ISP Infrastructure

      Operators deploying rural wireless networks use integrated cabinets to standardise their point-of-presence (PoP) installations—reducing installation time from days to hours and creating a consistent, maintainable network node across all sites.

      Community Wi-Fi Nodes

      Each community access point in a mesh network can be a single pre-integrated cabinet—solar powered, self-contained, and remotely monitored. No generator, no separate battery enclosure, no separate network rack.

      Government & Development Programme

      Deployments for programmes rolling out connectivity or digital services across dozens or hundreds of sites, integrated cabinets enable consistent quality, faster mobilisation, and simpler procurement and logistics.

      Remote Industrial & Monitoring Sites

      Oil, gas, mining, agriculture, and utilities operators use integrated cabinets to power and connect remote sensors, SCADA systems, cameras, and monitoring equipment in locations with no infrastructure.

      Emergency & Rapid-Deployment Connectivity

      Pre-built and tested cabinets can be deployed rapidly in disaster response, emergency health, or temporary operational situations where speed of deployment is critical.

      Deployment process

      Step by step deployment focused on GMDSS compliance and uninterrupted maritime communication.

      01/06

      Requirements Definition

      We gather your site specifications—power availability, connectivity type, load list, required autonomy, environmental conditions, and any mounting or physical constraints.

      02/06

      Cabinet Configuration & Quotation

      We specify the exact configuration for your requirements and provide a detailed quotation including cabinet, all components, factory testing, and delivery.

      03/06

      Build & Factory Acceptance Testing

      We build the cabinet in our workshop, wire and configure all components, and conduct a full factory acceptance test (FAT) under load before shipping.

      04/06

      Delivery & Site Installation

      The cabinet is delivered to site fully tested and ready. On-site installation involves mounting, connecting the external power inputs (solar panels, grid, generator), connecting the external antenna or satellite terminal, and final commissioning checks.

      05/06

      Remote Monitoring Activation

      Monitoring is activated during commissioning. You receive access to the management dashboard showing live power, battery state, network performance, and alerts.

      06/06

      Support & Warranty

      All cabinets carry a full system warranty. We provide remote diagnostics, field support, and component replacement for the duration of the warranty and beyond.

      Let’s Build Your Infrastructure

      Whether you’re connecting remote operations, upgrading maritime systems, or deploying digital inclusion projects, our team is ready to engineer the right solution.

      Offshore vessel with maritime communications equipment on open water

      Get useful updates on smarter tools and technology.

      Your data stays safe. No spam, ever.